The first step in building surveying is to locate the correct location of the building on its lot by analyzing property lines and construction plans.
Establishing the correct alignment on a road way project is critical. This critical element is accomplished by surveying the center line or the construction baseline of the roadway.
A-team from the engineering industries describing a survey carried out at the completion of a project, or a precursor to new works being carried out on exiting engineering sites or equipment.
Control survey establishes a system of horizontal or vertical marks that serve as a basic for other survey.
Topographic surveys are generated for the purpose of determining the location of natural and artificial features and elevation of a particular site or project and showing them on map.
Understanding the tract of land description and survey history is the basic for any survey.
Construction of pipe line electricity lines and other utilities involve a number of different techniques and applications.